Bridges below Vyšehrad, Prague
The proposal makes use of the authentic existing structure of the Výtoň railway bridge. However, it moves the bridge north of the current railway alignment and transfers rail traffic onto a new structure. Freed from the demanding technical requirements of railway operation, which the historic material cannot fully meet, the existing historic structure becomes a generous promenade with views of Prague Castle. The new railway structure is a contemporary lattice arch structure with slightly inclined arches.
Its shape remains sufficiently close to that of the original bridge not to overpower it, while still having a clearly legible form that
is distinct from the original. The result is a collage spanning the entire 500-metre structure. Seen both from afar and up close, the bridge ensemble reads as a visual interweaving of its parts, combining old and new – as is characteristic of Prague.
Team: Jan Vrbka, Jiří Stráský (SHP), Jan Nováček (SHP), Roman Strnad, Otto Plášek, Tomáš Říha, Jiří Jurenka, Adam Hajdák.
Advancement to the final round – ČKA competition dialogue.








